Wednesday 28 January 2009

Day 23 - Insulation Finished


Marcus and Sam today (Simon on holiday this week). The rest of the insulation was put in/up which all takes time because of the shapes of the roof etc. (I did try speaking to a higher up building control man to see if there was any way to lessen the depth of the insulation being put in so that our headroom was not compromised, but again, no luck. Well at least we have tried and, in fact, although David cannot stand up straight in the study part of the loft, he'll be sitting at his desk if he is in there and it doesn't feel too bad at all. Very glad we put in the extra Velux though). The plasterboard arrived and it took lots of trips up and down the stairs to get it all into the loft. A good tidy up at the end of the day as well ready for the building inspector again tomorrow.

No comments: